Capabilities

Designed, built, and maintained in-house.

Our engineers design the route, our crews build it, and our NOC runs it. That's how we build for less and hit our dates.

No subcontractor markup

Our crews are on our payroll, so there's no general contractor margin added to your build.

We own the equipment

Drills, plows, bucket trucks, and splice trailers are ours. No rental costs passed through.

Fewer change orders

Our engineers design with the crews who build it, so designs don't get redone in the field.

Dates we can hold

We set the construction schedule, so the in-service date we quote is one we control.

Vertically integrated

What we do in-house

01

Route engineering

Route selection, OSP design, and optical design.

  • Multi-path route options
  • Constructability review
  • Optical and latency design
  • Permit-ready drawings

02

Permitting & right-of-way

Railroad, DOT, municipal, and private easements.

  • Railroad crossings
  • State and federal DOT
  • County and municipal ROW
  • Pole attachments

03

Construction

Aerial, underground, and directional bore with our own crews and equipment.

  • Aerial and strand
  • Trenching and plowing
  • Directional drilling
  • Laterals to sites

04

Splicing & testing

Fusion splicing and OTDR testing, with traces and as-builts at turn-up.

  • Fusion splicing
  • Bidirectional OTDR
  • Loss budgets
  • As-built records

05

Diverse routes

Physically separate paths, documented in GIS.

  • No shared conduit or entries
  • GIS separation reports
  • KMZs for your review
  • Audits of existing routes

06

Operations & maintenance

24/7 NOC and field crews who know the route because they built it.

  • 24/7 NOC
  • Direct crew dispatch
  • Preventive maintenance
  • SLA reporting

Process

How a build works

  1. 01

    Feasibility

    Route, cost, and schedule

  2. 02

    Engineering

    Construction-ready design

  3. 03

    Permitting

    Easements and approvals

  4. 04

    Construction

    Our crews and equipment

  5. 05

    Splice & test

    OTDR on every segment

  6. 06

    Turn-up

    Circuits lit and accepted

  7. 07

    Operate

    24/7 NOC and field crews

Send us the endpoints. We'll send a route, a date, and a price.

Request feasibility